  • Wall leveling

    infrared positioning scanning,wall deviation should be less than 1cm is good,beyond the size should be used to cushion up or putty leveling.

  • Timber keel positioning

    from the top to the bottom at intervals of 60CM laying horizontal strips of wood square(wood square 3*4 is good),steel nails to play firmly!

  • Large-area paving boards

    from the side of the house to start laying the past,with stainless steel fasteners fixed to the wooden square keel,at least 3 fasteners per board.Adjacent plate fasteners should be staggered installation.

  • Modeling

    after the sheet is paved,according to the design drawings to locate the line modeling position,the line with 45° cutting,after the card line.

  • Post-trimming

    each seam,there may be a little interface is not neat,available special cosmetic adhesive maintenance processing.